HMIS Newsletter No.20
RNDP
The loan agreement for Road Network Development Project (RNDP), Loan No 1876 NEP (SF), was signed on the December 2002 between Kingdom of Nepal and Asian Development Bank. It had also been agreed that a part of RNDP is financed under grant assistance of United Kingdom through Department for International Development (DFID). The total cost of RNDP (excluding project appraisal done by ADB/Manila under Technical Assistance, project management of Project Directorate ADB of DoR, cost of resettlement/land acquisition and excluding other contingencies like escalation and interest) has been estimated to be 55.8 M US$, which is about 4.2 billion NRs.
No. 20 |
|
|
|
S.No. |
Description of Work |
Estimated
Cost |
ADB Loan
|
DFID Grant
|
HMG
finance |
Contract
nos/type |
A |
East West Highway Pavement
Strengthening Component |
|
|
|
|
|
i |
Belbari-Chauharwa: 140 Km |
17.00 |
13.60 |
|
3.40 |
1 ICB |
B |
Road Improvement Component
|
|
|
|
|
|
i |
Biratnager-Bardanga, Urlabari-Bardanga: 67 Km |
7.00 |
5.60 |
|
1.40 |
1 ICB |
ii |
Damak -Gaunganj: 22 Km
|
2.00 |
1.60 |
|
0.40 |
2 LCB |
iii |
Dolalghat -Chautara: 25 Km
|
2.50 |
2.00 |
|
0.50 |
3 LCB |
iv |
Pauwal Bhanjyang -Phidim: 28 Km
|
3.20 |
2.56 |
|
0.64 |
4 LCB |
v |
Hile- Banastapur: 26 Km |
2.80 |
|
2.24 |
0.56 |
3 LCB |
C |
Feeder Road Construction Component
|
|
|
|
|
|
i |
Hile- Basantapur-Khandbari: 96 Km
|
9.20 |
|
7.36 |
1.84 |
RAP |
D |
Performance Based Maintenance Component 4 Stretches: approximately 75 km each
|
4.00 |
2.60 |
|
1.40 |
4 LCB |
E |
Kakadbhitta 10 Km. Sufficient width and strength to handle commercial traffic and provide better access to other facilities like custom, freight handling etc
|
1.50 |
1.20 |
|
0.30 |
1 LCB |
F |
Road Safety/ Axle load Component :
Road Safety in project roads, Procurement and Installation of 10 weighing bridges
|
0.40 |
0.30 |
|
0.10 |
1 |
G |
Poverty Intervention Component
|
0.50 |
0.4 |
|
0.10 |
RAP |
|
Consulting Services |
5.7 |
5.7 |
|
0.00 |
|
| |
Total |
55.80 |
35.56 |
9.60 |
10.64 |
|
|
| |
Regarding the current status of the RNDP, the survey works of the components B and C are near to the completion. The pavement investigation work for both Pavement Strengthening and Road Improvement Component is in progress. The final design is expected to be completed within the first quarter of year 2004.
The Pre-qualification documents for two ICB contracts have already been prepared and awaiting the final concurrence from ADB.
Similarly, the Stretches to be included in Performance based Maintenance Contract have been surveyed and finalized which are the following parts of East-West Highway.
Hetauda-Narayani Bridge, Kohalpur-Karnali
Karnali-Sivaganga (15 Km east of Attaria), Siva Ganga-Gadda Chauki
Pre-qualification documents for these PBMCs have been prepared and forwarded for approval. |
| |
Dear Reader,
We cordially invite you to become regular reader of our NEWSLETTER. We welcome your comments on and suggestions about the coverage and presentation in this NEWSLETTER. And of course, we invite news items and short articles reflecting your experiences in Road Network & Management.
Thank you.
|
| |
| |
|
|
Mailing Address
Highway Management Information System Unit ( HMIS)
Department of Roads
Phone 426 2693 Ext: 195
email : news@dor.gov.np |
|
Chief Advisor |
: |
Dhruba Raj Regmi, DDG |
Advisor |
: |
Sushila Dali, Senior Transport Economist |
Editor |
: |
Gambhir Shrestha, Engineer,HMIS Unit |
| |
: |
Umesh Bindu Shrestha, Engineer HMIS Unit |
| |
|
|
| |
|
|
| Computer Design |
: |
Rajendra Thapa, Computer Operator, HMIS Unit |
|
|
| |
| |
|
|
|
|